Rotate back to portrait

Please rotate your device to portrait mode for the best experience.

UCLH

  • Location

    Fitzrovia, London

  • Details

    Manufacture and installation of specialist healthcare joinery and fixed furniture within a major NHS hospital development.

WHY

To deliver specialist healthcare joinery that meets the stringent infection control and clinical performance requirements of a leading NHS neonatal facility.

Infection control was a critical driver throughout the construction of the Elizabeth Garrett Anderson (EGA) Wing at University College Hospital. Martek’s expertise in manufacturing high-quality joinery incorporating antibacterial materials and systems was a key factor in its appointment to the project.

The EGA Wing represents the final phase of the wider University College Hospital redevelopment and provides specialist neonatal services within the capital. Officially opened by HRH The Princess Royal, the £70m facility forms part of the wider £500m hospital development.

Building on the successful delivery of similar works within the main 20-storey hospital tower, Martek was commissioned to manufacture fixed furniture and complete the fit-out of the reception and nursing station areas, ensuring consistency of quality and performance across the campus.

WHAT

Specialist healthcare joinery and fixed furniture including reception areas and nursing stations within the EGA Wing.

WHAT

Specialist healthcare joinery and fixed furniture including reception areas and nursing stations within the EGA Wing.

HOW

Martek delivered specialist healthcare joinery solutions using antibacterial materials and systems, meeting NHS infection control standards and project requirements.

HOW

Martek delivered specialist healthcare joinery solutions using antibacterial materials and systems, meeting NHS infection control standards and project requirements.

Leave a Reply

Your email address will not be published. Required fields are marked *